In 2021, we received the order to replace an old scoreboard from the MTG Mariendorfer Trabrenn GmbH & Co. Verwaltungs-KG in Berlin, as an old system with light bulbs had still been in use here since the opening in 1913.
This scoreboard is used during the trotting races to display the betting odds and the results.
In order to connect our new steel structure to the old scoreboard building, we had to partially flex the foundations. To the steel girders were then the 21 x 3,3 m big Ultraline SX_UL_1000_O-DGWv1a with 10 mm pixel pitch and Gold Wire SMD 3535 attached.
We were also responsible for the electricity planning, which is why we ensured data transmission from the control room approx. 100 m away by means of a directional radio beam.
Our light sensors and controllers were also installed here.
As golf is also played on the site in the immediate vicinity of the LED advertising board from time to time, we also installed a safety net in front of the wall.
Even after the project was completed, we remained on site with our service team for several races in order to train the operators and resolve any initial difficulties promptly.